Work grounded in
real conditions.
Selected historical project records show what was observed, what was attempted and what still required attention. Current performance requires new site-specific verification.
Three ponds. One connected challenge.

Field records for Mehrauli Archaeological Park describe three interconnected oxidation ponds receiving polluted inflow and supplying horticultural water.
Documented interventions
Manual waste removal, inlet waste interception and floating constructed wetlands. The record reports inlet-grate installation in September 2020 and ongoing treatment and sampling.
What the evidence says
The preliminary report describes lower BOD, COD and ammonia alongside increases in suspended solids and phosphate. It calls for continued testing, maintenance and upstream treatment. These observations do not establish current compliance or isolate the effect of one intervention.
Source: company-held preliminary and initial Mehrauli reports, including November 2020 sampling, prepared by Dr Jasper Wybe Swierstra, the company’s then Chief Scientific Officer.



Polishing needs a reliable upstream process.

A project report documents installation and operation of an ultrafiltration unit to polish STP-treated water for lake replenishment and horticultural use.
What the record reports
A single sample dated 15 October 2020 recorded TSS of 6 mg/L and COD of 60 mg/L. The report identified unresolved COD and subsequent raw-sewage ingress from a broken pipe.
The operating lesson
Protect the feed-water conditions, repair upstream contamination and repeat sampling before making a performance claim. A polishing plant cannot substitute for an appropriate sewage-treatment train.
Source: company-held Ashoka Park ultrafiltration report by Dr Jasper Wybe Swierstra, with observations extending into January 2021. Historical results require repeat testing against the applicable standard before any compliance claim.
Start at the pollution pathway.
An initial report records sedimentation works, drains and mixed inflow, and recommends waste interception, completion of civil works and decentralised treatment. It records a site visit in December 2019; the file is dated December 2020.
Evidence status
This is an assessment and treatment proposal. It is not presented as a commissioned facility or verified treatment result. The file’s title and place names are inconsistent, so the precise site identity requires confirmation.
Operate. Monitor. Correct.
- 01
Assess
Establish site conditions and a measurable baseline.
- 02
Restore
Choose the right engineering and ecological intervention.
- 03
Operate
Fund maintenance and define operator responsibilities.
- 04
Measure
Check field, laboratory and operating evidence.
- 05
Sustain
Correct, adapt and preserve performance over time.
What needs to work better?
Share your site, environmental challenge and the outcome that matters.